HYDRAULIC IMPLEMENTATION STUDY FOR ADDITIONAL FLOOD PROJECTS DOWNSTREAM OF THE SETTLEMENT OF KOUFALIA

Home/Transport and Traffic Management Projects/HYDRAULIC IMPLEMENTATION STUDY FOR ADDITIONAL FLOOD PROJECTS DOWNSTREAM OF THE SETTLEMENT OF KOUFALIA
image005653228

Project

Client: Municipality of Chalkidona (former Municipalities of: Chalkidona, Koufalia, Agio Athanasio)

Area: Koufalia, Municipality of Chalkidona, Prefecture of Thessaloniki

Study Category: Road Construction & Transportation Project (10)

HYDRAULIC IMPLEMENTATION STUDY FOR ADDITIONAL FLOOD PROJECTS DOWNSTREAM OF THE SETTLEMENT OF KOUFALIA
(04/ 2011 – 06/ 2011)

Hydraulic Implementation Study for additional Flood Projects downstream of the Settlement of Koufalia – Draw of 2 local streets near the stream to build corresponding box-shaped sewers.

It is about a Road construction & transportation study concerning the construction of two local roads near the stream for the construction of corresponding box-shaped drains, in the framework of a Hydraulic Implementation Study for additional flood protection projects downstream of the Koufalia settlement.

Project Budget: 90.000,00 €