Timeliness

Home/Timeliness

Keep up to date on our industry

“Regional and urban planning of the Municipality of Skydra”

On 04-26-2018, a Contract was signed with the Municipality of Skydra for the preparation of the “Local Spatial Plan of the Municipality of Skydra” study. The study is prepared based on the New Spatial Planning Law 4447/2016 “Spatial Planning – Sustainable development and other provisions”, with the aim of preparing a spatial planning study for the entire Municipality. The Municipality of

STUDIES FOR THE IMPROVEMENT OF THE PROVINCIAL ROAD OF THESSALONIKI – ORAIOKASTRO (GALINI SETΤLEMENT)

On April 27 of the year 2022, the contract for the study “STUDIES FOR THE IMPROVEMENT OF THE PROVINCIAL ROAD OF THESSALONIKI – ORAIOKASTRO (GALINI SETΤLEMENT) ” was signed between the Municipality of Oraiokastro and the economic operators “GAIA SA”. MELETON D. MAMOUNIS & SIA”, “DKND ENGINEERS O.E.” and “GEOTER – DIDASKALOU E.E.”. The objective of this study is the improvement

Latest actions of GAIA S.A. in the context of corporate social responsibility

Our sensitivity to social and environmental issues combined with the continuous effort to contribute to a better future define the social responsibility that characterizes our company. At GAIA S.A. MELETON we make sure that we always provide our services free of charge to selected clients & Charity Foundations in order to maintain their sustainability and commitment to their goals. Also, within the

Donations of GAIA SA STUDIES in the school complex of Iktinoy 5 and Syggrou 31 in the context of corporate social responsibility

Our company GAIA SA  has undertaken on behalf of the Municipality of Thessaloniki the elaboration of the study “Electromechanical Study, Architectural Study and Environmental Study of the School Complex at 31 Syggrou Street” as well as the study “Electromechanical Study, Survey School Complex at 5 Iktinou Street ”. The objective of the studies is the specialization of the necessary construction and

” Restoration of the external gauge of the administration building, General Hospital Papanikolaou”

The architectural implementation study  was delivered on time on 25/07/2020 within the framework of the contract entitled “Restoration of the external gauge of the administration building” with the G.N.Th. Papanikolaou. The object of the project is the elaboration of all the necessary studies in order to implement the point restoration of parts of the building that present problems and pose risks

New contract signing: “Εlectromechanical study, architectural study and environmental study of the historical school complex at 5 Iktinou Street”

The contract entitled “Electromechanical study, architectural study and environmental study of the school complex at 5 Iktinou Street” was signed with the Municipality of Thessaloniki on 25/09/2020, which included the elaboration of architecture, electromechanical and Hydraulic studies in the framework of both of energy and static upgrade in the historic school complex of Iktinoy street. The scope of work of the

New cooperation with the company Green Line Energy

Our Company, having the necessary know-how but also long-term experience in matters of land use, spatial, urban planning and building legislation, property status, legal issues related to real estate and properties, land registry, etc. has been providing technical consulting services to ” Green Line Energy” for 2 consecutive years, for real estate properties throughout Greece. More specifically, we provide a package

“Εlectromechanical study of the project: “Creation of a center for the child”

The electromechanical study was delivered on time on 11/04/2018 within the framework of the contract signed between GAIA SA MELETON and the Municipality of Ioannina. The scope of works of the project include the elaboration of all the Electromechanical studies required for the proper operation of a center for the child after the change of use of a building (old asylum

“Electromechanical studies of the closed Swimming Pool Building of Xanthi”

The scope of works of this contract signed between GAIA SA STUDIES and the Municipality of Xanthi, is the elaboration of all the Electromechanical studies required for the proper operation and upgrading of the closed Swimming Pool Building of Xanthi. The studies elaborated consern the interior of the building and the installation of the necessary equipment outside in the surrounding

“Lighting studies of a total of 11 monuments in Thessaloniki”

The scope of works of this contract signed between GAIA SA STUDIES and the Municipality of Thessaloniki, is the elaboration of special lighting studies with the aim of lighting a total of 11 monuments in Thessaloniki, including Kamara, Rotonda, I. N. Panagias Chalkeon, I N. Panagia Achiropoititou etc. The studies (the preliminary design and the implementation study) were delivered on time