Project
Client: EGNATIA ODOS S.A.
Area: Section A/K of Strymona – Exochi (section 12-00) of Egnatia Odos
Study Category: Structural Design (08)
FINAL DESIGN OF THE BRIDGE K/D12, OF THE SECTION A/K OF STRYMONA – EXOCHI (SECTION 12-00) OF EGNATIA ODOS.
(09/2005-12/2005)
Structural Design