The architectural implementation study was delivered on time on 25/07/2020 within the framework of the contract entitled “Restoration of the external gauge of the administration building” with the G.N.Th. Papanikolaou. The scope of works of the project is the elaboration of all the necessary studies in order to implement the restoration of parts of the building that present problems and pose
The preliminary design and the final study were delivered on time, on 03-01-2020 and on 19-03-2020, within the framework of the contract entitled “Assignment of a study for the construction of a high school at 8 Ath. Giannousi and N. Zartinidis streets in the Municipality of Thessaloniki”. The subject of the contract includes the elaboration of studies in three stages (preliminary
The final study and the implementation study of the last group of school buildings of the contract with the Municipality of Kozani, entitled “Energy Upgrading Studies of Fourteen (14) school buildings in Municipality of Kozani” was completed and submitted in a timely manner on 23/12/2020, including general plans and drawings, detail plans, window panel tables and issues of calculations, auction,
All the studies of the 1st and 2nd Stage regarding the control of the property status, the arrangement of the buildings and the pre-earthquake control within the framework of the contract with the Municipality of Neapoli – Sykies, entitled “Legality control services of building and electromechanical installations, arrangement by law 4495/2017, building pre-earthquake control and evaluation of the structural condition”,
The contract for the “Study of the network of bicycle paths of the Prefecture of Preveza (Ionian Route)” was signed on 12-3-2020 with the Regional Unit of Preveza of the Epirus Region, which concerns the ground topographic survey of the area along the bicycle path with a total length of approximately 65km. Also within the cope of works is the
In the framework of the “Study for the registration of the ratified deed of implementation of the extension of the plan of the city of Grevena in the Hellenic Land Registry” signed on 12-11-2019 with the Municipality of Grevena, we have completed the process for the structuring of the final digital archives and currently we are waiting for the results
The cooperation with the Municipality of Maroussi continues within the framework of the contract “Topographic surveys for the needs of technical works of the Municipality of Maroussi” signed on 1-7-2019 and concerns the elaboration of topographic works and services, based on the applicable specifications for topographic studies and in particular in the execution of triangulations, polygonometry, topographic mapping of structured
The process of Posting the tables and diagrams of the existing property regime was completed in May 2019 in the framework of the study “Land Consolidation Study for the project “Irrigation Project of Margariti”, municipalities of Margariti, Katavothra and Eleutherio” and soon the process of the final decision-making on the objections by the Land Reclamation Committee is going to be
The process of the publication of the survey to the citizens and the submission of the requests for corrections of personal data, of manifest errors against the data of the cadastre, and the applications for the issuance of a certificate of cadastral real estate by citizens was completed in November 2020.
A contract was signed with the Municipality of Thessaloniki entitled “Study assignment for the construction of a high school”on 6/11/2019. The project concerns the Construction of a Lyceum in Toumpa area, and in particular it will contain the following studies: Architectural, Static, Electromechanical, Auction documents, Issuance of a building permit.