The architectural implementation study was delivered on time on 25/07/2020 within the framework of the contract entitled “Restoration of the external gauge of the administration building” with the G.N.Th. Papanikolaou.
The scope of works of the project is the elaboration of all the necessary studies in order to implement the restoration of parts of the building that present problems and pose risks for the safety of both patients and employees. More specifically, the optimal way of restoring the facades of the building was studied.