On the 01-06-2023, the Contract was signed between our joint venture “GAIA S.A. – APOSTOLOS TZIRINIS – DELCO EPE – DKND ENGINEERS O.E.” and the Technical Chamber of Greece for the “Regional and urban planning of the Municipality of Chios” study. The study concerns the entire Municipality based on Law 4447/2016 “Spatial Planning – Sustainable development and other provisions”.
The study is complex and includes the main spatial planning study, the Strategic Environmental Impact Study of the spatial proposals proposed by the main study and the Geological Risk and Geological Suitability Assessment Study of the areas to be urbanized as well as the investigation of the necessity of preparing a hydraulic and topographical study due to the possible presence of water currents in the areas to be built.
The study will determine, through guidelines and regulations, the pattern of spatial development and organization throughout the territory of the Municipality, the land use zones and building conditions and restrictions, the sizes of development, the general urban organization of the residential receptors, the basic environmental and technical infrastructures and the framework to protect the natural and cultural environment, to deal with emergency situations and to adapt to climate change.
It is a project of vital importance and high priority for the Municipality, which lacks urban planning, as it will contribute the most to the upgrading of the natural, social and economic environment, to the utilization of its comparative advantages and potentials and to addressing the problems and his weaknesses.