The scope of works of this contract signed between GAIA SA STUDIES and the Municipality of Xanthi, is the elaboration of all the Electromechanical studies required for the proper operation and upgrading of the closed Swimming Pool Building of Xanthi. The studies elaborated consern the interior of the building and the installation of the necessary equipment outside in the surrounding area.
The final electromechanical study was delivered on time on 15/01/2020. At this stage, the process for the issuance of the required building permit is taking place, followed by the elaboration of the implementation study and the preparation of the tender documents.