The final study was delivered on 29/7/2019 within the framework of the contract entitled “Lighting of monuments near the Egnatia Road” with the Municipality of Thessaloniki, which included phototechnical calculations, drawings and visualizations of the nighttime simulations, taking into consideration the specifications and the character of each monument.