Progress of the study “Structure Plan of Malevizi”

The B2 Stage of the Study was delivered  in April 2019. At the same time the Strategic Environmental Impact Assessment was also submitted revised. The approvals of the Geological Surveys and the SEIA are pending from the Central Administration of Crete and the final acceptance and approval of the study.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.