Economic Crisis ”knocked down” the construction
Economic Crisis ”knocked down” the construction
29/12/2016
Almost 15 times fewer homes built today compared with 2007, when construction activity was at its peak. During this year’s first eight months (January to August) were completed only 4,853 new homes, when in the corresponding period of 2007 were built 71,936 houses. This results from the details of the Greek Statistical Authority and town-planning profession that relied on a recent analysis of the Alpha Bank, indicating the extent of the fall in the housing market during the past few years and especially since the beginning of the economic crisis so far.
More on the Link: http://www.b2green.gr/el/post/41893/i-krisi-gkremise-tin-oikodomi
Big progress in 2016 for the climate change
Big progress in 2016 for the climate change
28/12/2016
In application has been officially since early November, the global agreement on combating climate change, which was signed in December 2015 in Paris, exerting pressure in about 200 countries to begin to implement plans to reduce emissions of greenhouse gases.
Source: http://www.b2green.gr/el/post/41851/megali-proodos-to-2016-gia-tin-klimatiki-allagi
Approval of the Statute of the Engineers and Public Works Constructors Fund (EPWCF)
Approval of the Statute of the Engineers and Public Works Constructors Fund (EPWCF)
28/12/2016
By decision F.80000 / oik.58192 / 2153 / 22.12.16 approved the Statute of the Engineers and Public Works Constructors Fund (EPWCF).
More on the Link: http://www.b2green.gr/el/post/41867/egkrisi-katastatikou-tou-tameiou-michanikon-ergolipton-dimosion-ergon-(tmede-npid)
In Gov. G. energy inspections changes, Law 4178/2013,the stations assistance & new spatial planning
In Gov. G. energy inspections changes, Law 4178/2013,the stations assistance & new spatial planning
27/12/2016
In Government Gazette the changes of energy inspections, the changes of the Law 4178/2013, the stations assistance & the new spatial planning.
Published the Government Gazette with the number 241 A 2016 by Law 4447/2016 “Spatial planning – Sustainable development and other provisions”, which voted few days ago.
More on the Link: http://www.b2green.gr/el/post/41820/se-fek-oi-allages-ton-energeiakon-epitheoriseon-oi-allages-tou-4178-2013-i-enischysi-stathmon-ape-&-o-neos-chorikos-schediasmos
Without Urban Planning half Greece
Without Urban Planning half Greece
27/12/2016
s that applied the previous legal framework for the general urban plans completed only the 16% of studies that commissioned, while the 31% is still in progress. It is characteristic that the first general urban plan approved … 10 years after the adoption of the law! With no current and for a two-year framework which is being amended, no new urban plan approved, once the necessary requirements were not defined.
More on the Link:
http://www.michanikos.gr/_/%CE%95%CE%B9%CE%B4%CE%AE%CF%83%CE%B5%CE%B9%CF%82/1350016317/%CE%A7%CF%89%CF%81%CE%AF%CF%82-%CF%80%CE%BF%CE%BB%CE%B5%CE%BF%CE%B4%CE%BF%CE%BC%CE%B9%CE%BA%CF%8C-%CF%83%CF%87%CE%B5%CE%B4%CE%B9%CE%B1%CF%83%CE%BC%CF%8C-%CE%B7-%CE%BC%CE%B9%CF%83%CE%AE-%CE%95%CE%BB%CE%BB%CE%AC%CE%B4%CE%B1-r5190
Extension for one year in arbitrary buildings regulation
Extension for one year in arbitrary buildings regulation
23/12/2016
Extension on the deadline for the legislation of arbitrary buildings, which they do not have city planning offenses, but they were so designated because lacked of a legal building permit opens amendment that passed the draft law on the spatial planning of the Ministry of Environment.
Essentially, the amendment gives one year extension to an existing regulation, which gave the right to property owners who fall into this category and were included in Law 4178/2013 to take the necessary moves in order to issue a license.
More on the Link: http://www.b2green.gr/el/post/41742/paratasi-gia-enan-chrono-sti-rythmisi-afthaireton
18 new cases of arbitrary buildings based on the Law 4178/2013
18 new cases of arbitrary buildings based on the Law 4178/2013
22/12/2016
Following the official extension of eligibility period to the Law. 4178/2013, the Regional Department of Peloponnese of the Technical Chamber of Greece informed again the list of questions and answers and clarifications on the above Bill “Tackling illegal construction – Environmental Balance and other provisions” with new cases.
The 53 are very useful files with a total of 1,313 questions – answers, you can find the following:
More on the Link: http://www.b2green.gr/el/post/41716/18-nees-periptoseis-afthaireton-vasei-n4178-2013
Approved by majority the Spatial Planning the Bill with 38 amendments
Approved by majority the Spatial Planning the Bill with 38 amendments
21/12/2016
With the approve, by a majority, in total of 36 amendments, 18 ministerial and 20 parliamentary, completed the discussion and passage of the Bill the Ministry of Environment and Energy, on spatial planning and sustainable development.
The submission, however, dozens of amendments, competence of many other ministries, caused the protest of the opposition party, while the Minister of Environment, Giorgos Stathakis, who made them accepted, described them as necessary, arguing that most concern matters that agreed during negotiations for the second evaluation closure.
More on the Link: http://www.b2green.gr/el/post/41697/yperpsifistike-kata-pleiopsifia-to-chorotaxiko-n-s-me-38-tropologies
Specifically measures for the transition of the engineers to the EFKA request the T.C.G.
Specifically measures for the transition of the engineers to the EFKA request the T.C.G.
21/12/2016
Letter sent today the President of Technical Camber of Greece, Giorgos Stasinos, following a decision of the Executive Committee of the Technical Camber of Greece, to the Minister of Ministry of Social Insurance, Labour & Social Solidarity Efi Achtsioglou, the Undersecretary Taso Petropoulo and the temporary board of directors of Single Body of the Social Insurance.
More on the Link: http://www.b2green.gr/el/post/41691/sygkekrimena-metra-gia-ti-metavasi-ton-michanikon-ston-efka-zita-to-tee
Application of Updating Urban Planning
Application of Updating Urban Planning
18/12/2016
Presented the Web Application of the GIS of the Municipality of Heraklion, in a special event of Urban Planning Board, in Cultural Center. The GIS created by the Urban Planning and Programming administrations of the Municipality, on cooperation with the contractor.
More on Link: http://www.b2green.gr/el/post/41574/efarmogi-poleodomikis-enimerosis