TAP PROGECT- Trans Adriatic Pipeline (TAP)
13/9/2013
TAP PROJECT- Trans Adriatic Pipeline (TAP)
Digitalization of property boundaries from orthophotos and existing cadastral data in Greece and Update of Cadastre in Greece for the need of the Trans Adriatic Pipeline (TAP) construction.
GAIA SA MELETON as a member of the joint venture TOPMAPS (GAIAS SA, MAKEDONIKI ETM EE, GEOMATICS SA) undertook the “Digitalization of existing cadastral data in Greece for Trans Adriatic Pipeline (TAP)” in order to collect, georeference and digitize all available existing cadastral data that are necessary for the affected rights recording, in the framework of the construction of TAP. It also undertook the “Update of cadastre in Greece” in order to verify and update the existing cadastre and to supplement with all data that are necessary for the affected rights recording, in the framework of the construction of TAP.
The Trans Adriatic Pipeline – TAP will transport gas via Greece and Albania and across the Adriatic sea to Italy’s southern Puglia region and further to Western Europe. The project is aimed at enhancing supply security as well as diversifying gas supplies for the European markets.
TAP plans to open a new southern gas corridor to Europe and market outlet for natural gas from the Caspian Sea regions. The project is designed to expand transmission capacity from 10 to 20 bcm / year.